Gantt Chart Dispatch
1. Gantt Chart Dispatching Settings
1.1 Assigning Engineers Only via Gantt Chart
Use Case:
When dispatchers need to assign only engineers via the Gantt Chart and want engineers to perform on-site services according to the customer’s scheduled time.
Configuration Highlights:
1. Work Order Time Arrangement:
- Select “Auto-match” for the planned service time. The system will automatically match the plan_time_range__c (planned service time) with the booking_time_range__c (scheduled service time). By default, the system sets:
- Scheduled start time = Planned start time
- Scheduled end time = Planned end time
- Mandatory Field for Work Orders:
- Ensure the “Scheduled Service Time” (
booking_time_range__c) field is set as mandatory for the Work Order object. - For enterprises using legacy fields, set the “Scheduled Time” (
field_fwrq__c) as mandatory instead.
- Ensure the “Scheduled Service Time” (
picture coming soon:
picture coming soon:
Navigation:
Dispatchers or service group dispatchers can assign Work Orders via the To-Do > Pending Assignments > Gantt Chart Mode. Upon successful assignment, the system automatically synchronizes the scheduled and planned service times.
picture coming soon:
picture coming soon:
1.2 Assigning Engineers and Scheduling Service Time via Gantt Chart
Use Case:
When dispatchers need to manually assign engineers and schedule the plan_time_range__c (planned service time).
Configuration Highlights:
1. Work Order Time Arrangement:
- Select “Manual Drag” for the planned service time. Dispatchers can manually drag to assign engineers and set the plan_time_range__c (planned start and end times).
picture coming soon:
Navigation:
Dispatchers or service group dispatchers can assign Work Orders via the Service Connector > Web > “Work Order Assignment” > Gantt Chart Mode. The system will populate the plan_time_range__c field based on the manually dragged time range.
picture coming soon:
2. Gantt Chart Configuration
- Work Order Information/Layout:
- Includes Work Order list and Work Order card summary.
- Work Order Color Blocks:
- Configurable display fields and colors.
- Engineer Information:
- Engineer summary fields.
picture coming soon:
picture coming soon:
3. Additional Notes
- Collaborative Engineers:
- The current engineer is displayed as a collaborative engineer for the Work Order in the Gantt Chart.
picture coming soon:
- Actual Service Time:
- To track the actual service time of a Work Order, configure the following fields via functions:
- Actual Start Time:
actual_start_time__c - Actual End Time:
actual_end_time__c
- Actual Start Time:
- These fields enable Gantt Chart comparisons between planned and actual service times.
- To track the actual service time of a Work Order, configure the following fields via functions: