Published at: 2025-10-31

Engineer Accepting, Rejecting, or Reassigning Work Orders


  • Process Node: Order Acceptance
    • Support engineers can accept, reject, or transfer Work Orders
  • Rejection:
    1. Rejection within the service team: The assigned engineer may reject the Work Order, and the dispatcher will reassign it.
    2. Rejection notes: Configurable fields for engineers to provide rejection reasons.
  • Transfer:
    1. Engineer transfer: Reassign the Work Order to another engineer.
    2. Transfer notes: Configurable fields for engineers to provide transfer details.
  • Auto-acceptance upon timeout: The system automatically accepts the Work Order if no action is taken within the configured timeframe.

picture coming soon:

Engineer operation example:

picture coming soon:

Submit Feedback